Formula For Down Hours On Mining Equipment

  • (PDF) Performance Measurement of Mining Equipment

    (PDF) Performance Measurement of Mining Equipment

    to the development o f mining equipment", The mining engineer, 142(250), 95 -103, 1983. [25] Vagenas N., Kumar U. and Ronnkvist E., "Analysis of truck

    Online Service
  • Optimization of the fleet per shovel productivity in .

    Optimization of the fleet per shovel productivity in .

    Optimization of the fleet per shovel productivity in surface mining: Case study of Chilanga Cement, Lusaka Zambia Marsheal Fisonga1,2* and Victor Mutambo1 Abstract: A well-organized fleet management in surface mining is required in order to maximize truck per shovel Match Factors. The most common materials handling

    Online Service
  • MTTR, MTBR, Failure Rate, Availability and Reliability .

    MTTR, MTBR, Failure Rate, Availability and Reliability .

    Jul 21, 2014 · In process industries if a chain of machines run without any problem for several hours then a stage comes for the final equipment deliver the finished product. Often paper industry is quoted as an example. If a machine breaks down .

    Online Service
  • Maintenance Management KPI's

    Maintenance Management KPI's

    Equipment Availability. Definition: "Equipment Utilization" measures the percentage of time a piece of equipment is actually operationally in a 24 hour day, for a given period of time.The performance measurement is the productive time expressed as a percentage of the total time available. Responsibility: The reporting of Equipment Utilization is the responsibility of the Production Controller.

    Online Service
  • TECHNICAL CALCULATION AND ESTIMATOR'S MAN .

    TECHNICAL CALCULATION AND ESTIMATOR'S MAN .

    Thank you for showing interest in buying our book TECHNICAL CALCULATION AND ESTIMATOR'S MANHOURS MANUAL You can buy the electronic v ersion of the Manual containing all the figurest .

    Online Service
  • 3. CALCULATION OF MACHINE RATES

    3. CALCULATION OF MACHINE RATES

    For equipment that works very few hours per day, the derived equipment lives may be very long and local conditions should be checked for the reasonableness of the estimate. 3.3.3 Salvage Value (S) This is defined as the price that equipment can be sold for at the time of its disposal. Used equipment rates vary widely throughout the world.

    Online Service
  • Performance Measurement of Mining Equipments by Utilizing .

    Performance Measurement of Mining Equipments by Utilizing .

    Acta Montanistica Slovaca Ročník 15 (2010), číslo 2, 95-101 95 Performance Measurement of Mining Equipments by Utilizing OEE Sermin Elevli1 and Birol Elevli2 Over the past century, open pit mines have steadily increased their production rate by using larger equipments which require

    Online Service
  • A Formula for Construction Equipment Cost Recovery | For .

    A Formula for Construction Equipment Cost Recovery | For .

    Jul 17, 2006 · Multiply the total cost of a piece of equipment x 5%/month x 13 x 80% to arrive at the estimated annual rental dollars. Following is an example: Equipment cost 100,000. Depreciable life 5 .

    Online Service
  • Machine Hours Rate: Formula and Calculation (With .

    Machine Hours Rate: Formula and Calculation (With .

    Machine Hours Rate: Formula, Calculation, Problems and Solutions! The machine hour rate is similar to the labour hour rate method and is used where the work is performed primarily on machines. If factory overhead is Rs 3, 00,000 and total machine hours are 1,500, the machine hour rate is Rs 200 per machine hour (Rs 3, 00,000 ÷ 1500 hours).

    Online Service
  • How to Calculate Throughput Time | Bizfluent

    How to Calculate Throughput Time | Bizfluent

    Nov 16, 2018 · Putting this example to use, say your business manufactures spatulas. You calculate that you're manufacturing 10,000 spatulas a day, with your equipment running 16 hours per day. To determine how many spatulas you're manufacturing per hour, you could use the formula to break down .

    Online Service
  • KPI : Availability (excluding planned downtime) | KPI Library

    KPI : Availability (excluding planned downtime) | KPI Library

    Warehouse. Cementing & Stimulation. Drilling Fluid Supply. Mining & Drilling Products . M&DP Tel: 780-468-1654

    Online Service
  • Calculate TEEP – Measure Utilization and Capacity | OEE

    Calculate TEEP – Measure Utilization and Capacity | OEE

    Utilization = Planned Production Time / All Time. Here is a simple example, based on a manufacturing operation with a 65% OEE score, that is running two 8-hour shifts per day, five days per week. How to calculate OEE. Planned Production Time. 8 hours × 2 shifts × 5 days. 24 hours × 7 days. 80 hours / 168 hours. 0.6500 × 0.4762.

    Online Service
  • Drilling Techniques for Mining Exploration - Equipment .

    Drilling Techniques for Mining Exploration - Equipment .

    Dec 13, 2018 · It also requires more equipment and greater driving skills. However, RC drilling results in greater sample accuracy, making it a more popular form of mining exploration. It is the most common drilling technique used for mining exploration, particularly in South America and Australia.

    Online Service
  • KPI : Availability (excluding planned downtime) | KPI Library

    KPI : Availability (excluding planned downtime) | KPI Library

    The key here is to be able to discount planned maintenance activities. It is unlikely that you can make a system available of the time if you do not have redundancy built in, so for a network of equipment.

    Online Service
  •  | Influencing Mining Equipment Performance Through .

    | Influencing Mining Equipment Performance Through .

    Influencing equipment performance through maintenance metrics Successful sites use key measurements to improve availability. The primary deliverable for any mine maintenance organization is available hours that the operations department can use to meet its production goals. Performance in this area is reported in terms of availability.

    Online Service
  • 4 Examples of the Efficiency Formula - Simplicable

    4 Examples of the Efficiency Formula - Simplicable

    Jun 27, 2017 · The efficiency formula is a measure of the efficiency of processes and machines. The basic formula is a ratio of output to input expressed as a percentage: efficiency = (output / input) × 100. The energy efficiency of a machine that consumes energy is calculated as the useful energy that is output by the machine as compared to the energy consumed.

    Online Service
  • 3. CALCULATION OF MACHINE RATES

    3. CALCULATION OF MACHINE RATES

    For equipment that works very few hours per day, the derived equipment lives may be very long and local conditions should be checked for the reasonableness of the estimate. 3.3.3 Salvage Value (S) This is defined as the price that equipment can be sold for at the time of its disposal. Used equipment rates vary widely throughout the world.

    Online Service
  • How to calculate the machine's fuel consumption? | Heavy .

    How to calculate the machine's fuel consumption? | Heavy .

    Nov 07, 2013 · It doesn't take a fancy formula. Next time you fuel, fill it all the way and make a note of the engine hours. When you go to fuel the time after that fill it up all the way again. Note your hours again. Subtract your first reading from the second one. That's your run time.

    Online Service
  • Calculating Downtime During Hours of Operation [SOLVED]

    Calculating Downtime During Hours of Operation [SOLVED]

    May 01, 2018 · Hi All, I'm looking for assistance to help calculate incident down time relative to the hours of business operation. Incident downtime is only calculated during the business hours with the incident suspending outside of the contracted business hours. Using the forum threads I was able to identify a formula to calculate downtime during a standard business day Monday to Friday (8.5hrs x 5 days .

    Online Service
  • How to Calculate Machine Hours Worked | Bizfluent

    How to Calculate Machine Hours Worked | Bizfluent

    The time that a machine spends in active operation is referred to as machine hours. If you operate your production floor in two eight-hour shifts every day and your equipment runs continuously, your equipment logs 16 machine hours a day. On a five-day work week, that's 80 hours a week, which comes out to 4,160 machine hours .

    Online Service
  • Standardizing Availability Definition - Plant Maintenance

    Standardizing Availability Definition - Plant Maintenance

    1.3 Availability has various meanings and ways of being computed depending upon its use. Availability is defined as "a percentage measure of the degree to which machinery and equipment is in an operable and committable state at the point in time when it is needed." This definition includes operable and committable factors that are .

    Online Service
  • Productivity and Costs by Industry: Manufacturing and .

    Productivity and Costs by Industry: Manufacturing and .

    as output fell 3.3 percent and hours worked increased 4.9 percent. Mining • Labor productivity rose by 12.1 percent in the oil and gas extraction industry where a significant increase in output outpaced growth in hours worked. (See chart 2.) • The mining, except oil and gas industry had a productivity decline of 3.5 percent, as the

    Online Service
  • 7 A-Rated Gold Stocks to Buy For Your Portfolio Hedge .

    7 A-Rated Gold Stocks to Buy For Your Portfolio Hedge .

    May 07, 2020 · Most of these countries aren't known for their gold production, but EGO has been mining successfully for nearly 3 decades now, so it has the formula down, and little competition in its markets.

    Online Service
  • How to calculate the machine's fuel consumption? | Heavy .

    How to calculate the machine's fuel consumption? | Heavy .

    Nov 07, 2013 · It doesn't take a fancy formula. Next time you fuel, fill it all the way and make a note of the engine hours. When you go to fuel the time after that fill it up all the way again. Note your hours again. Subtract your first reading from the second one. That's your run time.

    Online Service
  • Productivity in mining - Ernst & Young

    Productivity in mining - Ernst & Young

    Labor productivity in the mining industry has been declining rapidly around the world. In the US coal sector, for example, labor productivity declined by an average of 27.5% from 2009 to 2012.

    Online Service
  • Calculate TEEP – Measure Utilization and Capacity | OEE

    Calculate TEEP – Measure Utilization and Capacity | OEE

    Utilization = Planned Production Time / All Time. Here is a simple example, based on a manufacturing operation with a 65% OEE score, that is running two 8-hour shifts per day, five days per week. How to calculate OEE. Planned Production Time. 8 hours × 2 shifts × 5 days. 24 hours × 7 days. 80 hours / 168 hours. 0.6500 × 0.4762.

    Online Service
  • Machine Hours Rate: Formula and Calculation (With .

    Machine Hours Rate: Formula and Calculation (With .

    utilization: The proportion of the available time (expressed usually as a percentage) that a piece of equipment or a system is operating. Formula: Operating hours x 100 ÷ available hours.

    Online Service
  • Financial reporting in the mining industry International .

    Financial reporting in the mining industry International .

    International Financial Reporting Standards (IFRS) provide the basis for financial reporting to the capital markets in an increasing number of countries around the world. Over 100 countries either use or are adopting IFRS. Those companies already on IFRS have their own challenges as the pace of standard-setting from the International

    Online Service
  • MTBF (Mean Time Between Failure) MTTR (Mean Time To Repair .

    MTBF (Mean Time Between Failure) MTTR (Mean Time To Repair .

    Mean Time To Repair (MTTR) is a measure of the average downtime. the formula for which is: This takes the downtime of the system and divides it by the number of failures. again, be sure to check downtime periods match failures. Mean Time To Repair (MTTR) Calculator. Hours Days Weeks. Number Of Failures. Hours Days Weeks. Calculate Clear.

    Online Service
  • MTBF and MTTR calculator

    MTBF and MTTR calculator

    On the other hand, without oil changes, an automobile's engine may fail after 150 hours of highway driving – that is the MTTF. Assuming 6 hours to remove and replace the engine (MTTR), Mean Time Between Failures is 150 hours. Like automobiles, most manufacturing equipment will be repaired, rather than replaced after a failure, so Mean Time .